[ View Thread ] [ Post Response ] [ Return to Index ] [ Read Prev Msg ] [ Read Next Msg ]

Rapid Refresh (RAP) and High-Resolution Rapid Refresh (HRRR) Forum

Re: extension to 18 hours 3/2/10 - completed 4/20

Posted By: Stan Benjamin
Date: 11-May-10 0044Z

In Response To: Re: extension to 18 hours 3/2/10 (Geoff Manikin)

If any of you noticed that the RUC performance seemed degraded between 2 March and 20 April, it was. Background: It was discovered on Monday 4/12 that the RUC upgrade implementation back on 2 March was not fully installed correctly at NCEP. First, ESRL found that the operational RUC had been performing worse verification-wise than the backup RUC run at ESRL since 3/2, primarily in the lower troposphere for wind and relative humidity. Then, NCEP then traced this further, discovering that some of the corrected executables from the upgrade were not put in the correct directories. These problems with the RUC executables were corrected on 20 April for the 15z run.

We apologize for not getting this message posted out on the RUC forum much earlier - the forum software was not properly.

Stan B.

Messages In This Thread

extension to 18 hours 3/2/10 -- Geoff Manikin -- 26-January-10 2304Z
Re: extension to 18 hours 3/2/10 -- Geoff Manikin -- 2-March-10 1910Z
ADMIN! Re: extension to 18 hours 3/2/10 - completed 4/20 -- Stan Benjamin -- 11-May-10 0044Z

[ View Thread ] [ Post Response ] [ Return to Index ] [ Read Prev Msg ] [ Read Next Msg ]

Rapid Refresh (RAP) and High-Resolution Rapid Refresh (HRRR) Forum is maintained by RR/RAP Forum Administrators with WebBBS 5.12.